Tuesday, 24 Nov 2026 · Hong Kong Hong Kong and China labour news in English
CLB.org.hk China Labour Bulletin Board
Hong Kong news · dedicated AI coverage 中國勞工資訊板 · Labour, employment, jobs and AI.
Hong Kong

Northern Link railway project to reduce costs, speed up completion

The Hong Kong government and MTR Corporation have finalised an agreement for the Northern Link Spur Line, which will connect to the Loop and Huanggang Port. The project is expected to save 28 per cent in construction time and cost, with completion now scheduled for 2034 and costs reduced to about HK

Northern Link railway project to reduce costs, speed up completion

The conclusion of the project agreement between the Hong Kong government and MTR Corporation marks the start of the Northern Link's Spur Line, connecting to the Loop and the Huanggang Port. This completes the railway network that will cover the Northern Metropolis, adding to the previously planned Northern Link which connects the Tuen Ma Line to the East Rail Line.

Adoption of the “Hong Kong Railway Standard” should enable the new line to take advantage of the latest railway engineering and allow it to be built within a shorter time and at a lower cost, with both anticipated to reap savings of 28 per cent, according to veteran engineer Edmund Leung Kwong-ho in a commentary published by The Standard.

The Spur Line is scheduled to be completed by 2034 instead of the originally planned 2036. The Northern Link project's construction cost has been reduced from more than HK$100 billion to about HK$86 billion, taking advantage of prefabrication, offsite modular construction, and system and component standardisation. The new project approval system will also substantially shorten the time between submission of plans and their approval.

Under the established “Rail plus Property” model, costs will be offset by the government allocating eight land sites to MTRC, totalling 46 hectares as of the latest agreement. MTRC will still pay the land grant but gain from developing the sites, which will be more valuable due to their adjacency to new railway stations.

The Northern Link has several unique features. It is predominantly an underground railway, which will help reduce the difficulties of land resumption and relocation of occupants. The construction method will use tunnel boring machines, with a larger supply allowing simultaneous drilling of multiple TBMs to shorten construction. However, building tunnels in close proximity to existing railway facilities poses additional challenges, as it is vital not to affect their operation.

Geotechnical conditions in the area include limestone in the bed soil, which may require adjustments in railway alignment to ensure tunnels rest on solid ground for safe operation. The railway network, which already covers most of the city, will provide access to the northern part of New Territories and the new Huanggang Port, providing a backbone of public transport to the Northern Metropolis and connecting it to all other parts of Hong Kong.

Adam
Editor in Chief

Editor in Chief overseeing CLB.org.hk coverage and editorial standards.